01.14 New Product GTM One-Pager Battle Card: T-90 to T+30 ​

Governance metadata | Owner: GTM Operator | Last reviewed: 2026-10-22 | Next review: 2027-01-31

Print it or pin it; tick it off every week. Details link back to the gates and tools. Thresholds follow the default effective definitions.


1. Full-Cycle At a Glance ​

PhasePrimary gateThis week's key outcomePrimary owner
T-90~T-61GR1 residual items + GR2 strategyPricing, order lock, certification schedulingGTM operator + Finance
T-60~T-31GR2 tooling and order lockTooling / first-batch PO, packagingSupply chain
T-30~T-1GR3 launch readinessCapacity, OTA, materialsQuality + Marketing
T-Day~T+30GR4 launch operationsFirst-week data, circuit-breaker monitoringEveryone

2. T-90 ~ T-61 ​

  • [ ] TAM/SAM/SOM sizing and must-have demand validation into GR1 (02.01)

  • [ ] Price waterfall and gross margin across the three channels (02.02 / 07.06)

  • [ ] Three-factor order lock + safety factor (03.04 Base)

  • [ ] Certification list and lab slot bookings (07.02)

  • [ ] Dual-source risk scan (03.06)

  • [ ] Insurance and recall financial draft (07.09)

  • [ ] Attribution/UTM specification draft (05.21)

  • [ ] Distribution terms if going through distribution (05.22)

3. T-60 ~ T-31 ​

  • [ ] GR2 three-branch decision written up (01.08)

  • [ ] Tooling T0 (03.01)

  • [ ] Packaging CBM and volumetric weight (03.03 / 03.08)

  • [ ] Pre-launch warm-up/VIP or PR timeline (05.02 or 04.04)

  • [ ] SQE and traceability (03.07)

  • [ ] Patent calendar D0 already kicked off (07.11)

4. T-30 ~ T-1 ​

  • [ ] GR3 adjudicated against the default thresholds (01.09)

  • [ ] OTA six-tier DoD (02.07)

  • [ ] PSI first 8 weeks (03.05)

  • [ ] Channel materials fully kitted

  • [ ] Customer service return interception (06.01)

  • [ ] AI cloud cost tier (07.10, if applicable)

5. T-Day ~ T+30 ​

  • [ ] Daily report: units / returns / ACOS·ROAS / inventory light / customer complaints

  • [ ] GR4 post-reserve net profit (01.10 / 07.06)

  • [ ] Sell-through 05.20; price violation 05.04

  • [ ] Cloud spot check (07.10)

  • [ ] T+30 mini post-mortem review: add orders or throttle production


6. Metric Dashboard (weekly update) ​

MetricDefault directionSource
Post-reserve net margin rate≥10%07.06 / GR1
ACOS at maturity>30% circuit-breaker (00.02 / 01.13
DOS110 → overstock03.05
Major customer complaintsTriggers escalation07.05
Unattributed spend>40% do not cut channels05.21
AI annual cloud cost / gross margin<20% watch07.10

GR1–5 / 07.06 / 07.07 / 00.03 / 03.06


8. Role Map (Who Ticks What) ​

SegmentPrimary tick owner
T-90~T-31GTM Operator
T-30Quality + Supply chain
T+0~T+30GTM Operator + Finance BP

9. Change Control ​

  • If any gate is a No-Go → stop ticking off later segments and roll back to the corresponding document
  • If the business changes a threshold value → update the 00.02/GR tables first, then this card's description

10. Rollback Card for a Failed Gate ​

Failed gateWhat stopsRoll back toMinimum condition to continue
GR2 No-GoTooling POGR1New market or a reduced BOM
GR3 No-GoFull-volume stock-upGR2Certification/OTA passed
GR4 No-GoIncreased ad spendGR3Post-reserve net profit offset plan
TaskBase
Order lock00.03 Order Lock Base
PSIPSI Base
GR reviewGR Review Package Base
KPIKPI Base

12. Weekly Meeting 15-Minute Script ​

  1. Six-box metric dashboard (2 minutes)
  2. Owners of the red-light items (5 minutes)
  3. Whether to advance to the next segment gate this week (3 minutes)
  4. Risk list update (5 minutes)

13. Minimum Table of Contents for the T-90 Project Kickoff Package ​

FileSource
Commercial concept one-pager02.01
Price waterfall02.02
First-pass P&L, three scenarios07.06
Certification matrix07.02
Dual-source scan03.06
Insurance quote status07.09

14. T-Day War Room Staffing ​

RoleResponsibilityOn duty
GTM OperatorOverall commandWhole week
E-commerceListing/adsDaily
FinanceDaily dashboard updateDaily
Customer serviceScript escalationDaily
Supply chainInventoryEvery other day

15. T+14 Mid-Cycle Review Questions ​

  1. How far is real CAC from the model?
  2. Has the refund rate broken through the 06.01 assumption?
  3. Was the GR4 circuit breaker triggered by mistake?
  4. Do we cut channels or double down?

16. Relationship to the 01.12 Gantt ​

  • 01.12: the full 56-item task library
  • This card: a weekly compressed version, does not replace 01.12
  • In conflicts, the gate documents and the finance single source of truth prevail

17. Printing and Collaboration ​

  • Print at A3 or pin it at the top of Feishu
  • Update the tick status every Friday
  • Changing a gate conclusion requires updating the dated version stamp battle card v2026-09-17

19. Channel Priority Matrix (T-60 Decision) ​

ChannelLead timeGross marginTraffic dependencyDefault priority
Crowdfunding90-day warm-upMediumHighGeek product P0
Amazon45 daysMediumHighStandard product P0
DTC site30 daysHighHighBrand product P1
Offline retail KA90–180LowLowMid-to-high ASP P2

Not every channel is opened by default within one project; the battle card only ticks the primary channel for the current phase.

20. Budget Slices (T-30 Illustration) ​

ItemShareMaps to
On-platform ads40%05.21 dashboard
Content/KOL25%04.03
Promotions/gifts20%05.05
Contingency15%Circuit-breaker remediation

21. Customer Complaint Escalation Ladder (T+0) ​

TierTriggerResponse
L1Isolated caseCustomer service SOP
L210 cases/day with the same root causeEscalate to product
L3Safety/media07.05 + 07.09

22. Trimming Against 01.06 Agile ​

For a 10-person team: the battle card tick owners may double up; gate co-signatures must never involve fewer than two people — the GTM operator plus Finance.

24. Minimum Input Checklist per GR Segment (Use Directly on the Card) ​

Before GR2 (lock before T-60) ​

  • [ ] Price waterfall for the three channels (02.02)

  • [ ] Order Lock Base safety factor ≥1.25 or the Conditional path

  • [ ] Certification lab PO / slot booking

  • [ ] FTO / dual-filing status (07.11)

  • [ ] Dual-source red-dot closure plan or written acceptance of residual risk

Before GR3 (T-7) ​

  • [ ] All 02.07 OTA DoD items passed

  • [ ] PSI W1–W8 with no red lights, or a contingency plan in place

  • [ ] Customer service return scripts trained (06.01)

  • [ ] If AI is in scope: the free-tier cost ceiling is locked (07.10)

GR4 Day 14 ​

  • [ ] Post-reserve net margin rate vs ≥10%

  • [ ] ACOS / unattributed spend / DOS traffic lights

  • [ ] Whether 05.20 or 05.04 has been triggered

25. Budget Slice Formula (Illustration) ​

Investable marketing budget ≈ Month-1 expected gross margin × factor (default 0.6–1.0)
                            × channel priority weight
Prohibited: guessing with an "industry GMV%" before gross margin is fully calculated

Precondition for adding budget: backend ROAS is on target and unattributed spend is <40% (05.21).

26. Weekly Meeting Red-Light Escalation Path ​

Red lightWithin 24hEscalate to
Post-reserve net profit <8%Stop adding budgetFinance + GTM operator
DOS <10 or >90Stop replenishment decisions automaticallySupply chain + GTM operator
Major customer complaintsStop ad spend (if safe)07.05
ACOS>30% for 3 consecutive daysCut low-efficiency campaignsSales + Marketing

27. Versioning and Changes ​

  • Update the version stamp every Friday
  • Any change to a gate conclusion must change the date
  • Conflict with 00.02 → update the dictionary first, then this card

28. Checklist (Final) ​

  • [ ] The three segments of input items have been ticked per project

  • [ ] This month's figures have been substituted into the budget formula

  • [ ] An escalation group chat has been created

  • [ ] The version stamp has been written

huajun.wang Smart Hardware GTM Playbook · Methodology