06.06 Large-Item Installation & Field Service Network ​

Governance metadata | Owner: Head of Service | Last reviewed: 2026-10-22 | Next review: 2027-01-31

Core principle: for large-item hardware, returns and NPS are often driven not by a bad product but by a bad installation. The installation network is part of the GTM cost model, not a vendor you find after launch.


1. Scope ​

Categories requiring on-site or semi-installation: energy storage, robotic mowers, pool equipment, major appliances, outdoor solar, smart locks, and similar.


2. Service Model Comparison ​

ModelAdvantagesDisadvantagesBest fit
In-house teamControllable quality, strong brand experienceHigh fixed cost, slow to scaleCore cities, high AOV
Authorized providersFast scaling, local presenceUneven quality, requires auditingRegional expansion
Platform dispatchBroad coverage, asset-lightHigh commission, inconsistent experienceLong-tail regions
HybridBalances quality and costComplex managementMost brands

3. Installer Onboarding and Auditing ​

  • Qualifications: business license, insurance, electrical/low-voltage credentials (by category);
  • Training: product structure, installation standards, safe operation, scripts;
  • Certification: authorize after assessment; grade A/B/C;
  • Auditing: mystery shopping, work-order sampling, photo evidence, score-based elimination;
  • Elimination: repeated bad reviews, rework rate above threshold, safety incidents.

4. Per-Unit Installation Cost Model ​

Per-unit installation cost =
  base labor hours × hourly rate
+ consumables (brackets/cables/seals)
+ travel (mileage/lodging, by region)
+ rework cost × rework rate
+ damage compensation × compensation rate
+ platform commission (if applicable)

Unit rates follow city and provider quotes. The model must keep "rework rate" and "compensation rate" as sensitivity variables.

Regional Cost Baseline (fill per market; no pre-filled values) ​

⚠️ Every figure must come from actual local provider quotes. Never carry a rate across markets — the same category can differ several-fold in labour rate between North America, Europe and Japan.

Cost itemUnitN. AmericaEuropeJapanANZMiddle EastSource
Labour rateper hourProvider quote
Visit / dispatch feeper visitProvider quote
Mileageper kmProvider quote
Working-at-height / hoistingper jobSpecialised quote
Electrical connection (if needed)per jobLicensed electrician quote
Consumables packper unitPurchase price
Rework rate%Work-order history
Compensation rate%Work-order history

Filling discipline:

  1. Take quotes from at least two providers; use the median and record the range;
  2. Quotes must state whether tax and insurance are included, to avoid post-signing add-ons;
  3. Rework and compensation rates may start as labelled assumptions in year one and be replaced with real work-order data in year two.

5. SLA ​

MetricTarget (empirical; calibrate by category)
Appointment responseWithin 24 hours
On-site lead time3–5 days in cities, 7–10 days in remote areas
First-visit success rate≥95%
7-day post-installation follow-up100%
Installation damage rate<1%

6. SLA Compensation Ladder and Assessment ​

An SLA without a compensation clause is a wish list. Compensation must be formulaic, settleable and capped.

1. Late arrival and no-shows ​

Per-event compensation = that job's installation fee × ladder percentage
SituationLadder % (suggested default)Note
On time0%—
Late ≤2h with prior notice0%Not penalised
Late >2h10%Customer may refuse
Rescheduled by the provider (<24h notice)25%Customer's time cost
No-show50%Also counts in the assessment
Customer cancels as a result100%Stacks with §8 damage liability

The percentages are suggested defaults to be negotiated per market and provider. What matters is that they are written into the contract and reconcilable, not the exact percentage.

2. Quality metrics ​

MetricDefinitionThresholdIf missed
First-visit success rateJobs completed and accepted on the first visit ÷ total jobs≥95%Deduct in proportion to the shortfall
7-day rework rateInstallation-caused rework ÷ completed jobs≤3%Rework is unpaid and the second visit cost is borne by the provider
Installation damage rateDamaged units ÷ completed units<1%Handled under the §8 liability layering
Photo complianceComplete uploads (six sides + nameplate + wiring) ÷ completed jobs100%A job missing any item is not settled

3. Settlement linkage ​

  • Monthly settlement, based on system work-order status only — paper forms are not accepted;
  • Sampling deductions: audit ≥10% of jobs each month; a mismatch between photos and reality deducts the batch proportionally;
  • Dispute window: 7 days after the settlement statement; silence is deemed acceptance.

7. Scheduling and Rescheduling ​

  • Scheduling: allocate by region/provider capacity to avoid overselling;
  • No-shows: record customer no-shows; charge a visit fee on the second no-show (with advance notice);
  • Coordination: property management, weather, and power conditions; confirm 24 hours ahead.

8. Damage Liability and Claims ​

  1. Pre-installation inspection: photo/video record of appearance and function;
  2. Liability layers: product defect / installation operation / customer environment;
  3. Insurance: provider liability insurance + brand product liability insurance;
  4. Claims: determine liability within 48 hours, close within 7 days.

9. Van Stock and Acceptance ​

  • Van stock: brackets, screws, seals, wear parts;
  • Post-installation acceptance: function demo, app pairing, safety check, customer signature, photo upload;
  • 7-day follow-up: usage issues, second visit, NPS.

10. Interface with Reverse Logistics ​

  • Installation failure/damage → 06.03 RMA grading;
  • Deep repair → 06.05 Repair Depot;
  • Return interception → 06.01 unboxing retention scripts.

11. Twelve Mandatory Service-Provider Contract Clauses ​

A contract is not a framework signature; it is where the §6 compensation ladder and §8 liability layering become enforceable.

#ClauseMust specifyIf missing
1ScopeCategories, territory, whether height/electrical/removal are includedOn-site upselling
2SLAResponse/arrival/completion times, consistent with §5Nothing to assess against
3CompensationLadder percentages, caps, triggers (§6)Cannot penalise
4InsuranceLiability limit; the brand must be a named insuredNo backstop after an incident
5LicensingElectrical/height/hazardous-work certificates and validityCompliance exposure
6Training & certificationNumber of sessions, assessment standard; no dispatch before passingQuality uncontrollable
7Spare parts & toolsWho supplies, who stores, who bears lossJob stoppage on site
8Photos & dataMandatory items, retention period, ownership and usage rightsCannot evidence
9ConfidentialityCustomer data, product materialsData leakage
10SettlementCycle, reconciliation basis, invoicing, dispute windowEndless disputes
11Audit rightsSampling, mystery shopping, work-order accessCannot verify
12Termination & handoverTermination for breach, in-flight job handover, spare-part stocktakeService interruption

Legal boundary: cross-border contract entity, tax and limitation of liability must be confirmed with 07.09 product liability insurance and Legal. This document is not legal advice.


12. Category Difficulty Matrix ​

One installation network covers very different difficulty and risk profiles — one SLA cannot serve every category.

CategoryComplexityRequired credentialsTypical durationMain risk
Energy storage / residential solarHighElectrician + grid-connection permitHalf a day~1 dayElectrical safety, grid compliance, roof load
Robotic mowerMediumNone (trenching for boundary wire)2~4hBoundary wire routing, RTK base placement
Pool equipmentMedium-highPlumbing/electrical3~6hPipe modification, leaks
Major appliancesMediumMoving + basic electrical1~2hEntry damage, old-unit removal
Smart lockMediumLocksmith/carpentry1~2hDoor modification, lock-body incompatibility
Outdoor lightingLowElectrician (if wired)1~2hWaterproofing, wiring

Three rules this implies:

  1. Set SLA per category: the first-visit threshold for storage should be lower than for locks (different complexity), while its compensation percentage should be higher.
  2. Licensing is a hard disqualifier: no storage/solar job goes to an installer without an electrician licence, however cheap.
  3. Spare parts per category: lock bodies for locks, connectors and fuses for storage — one universal kit does not work.

13. Safety, Insurance and Incident Response ​

1. Three high-risk work types ​

TypeRiskMandatory controls
Working at height (roof/hoisting)Falls, dropped objectsHarness, two-person rule, weather window
Electrical (grid connection/wiring)Shock, fireLicensed electrician, lockout-tagout, insulated tools
Batteries (storage handling)Short circuit, thermal runawayInsulated handling, no stacking, isolate on anomaly

2. Insurance chain ​

  • Provider liability insurance: covers injury and property damage from the work; the brand must be a named insured;
  • Brand product liability insurance: covers product defects, see 07.09;
  • Employer's liability: covers the installer's own injury, preventing the brand from being joined in.

3. Incident response (within 24h) ​

On-site containment (power off / isolate / medical)
  → report to brand and insurer within 2h
  → on-site evidence within 24h (photo/video/witness)
  → classify within 48h: product defect / installation error / customer environment
  → route to 06.03 reverse logistics or insurance claim

Prohibited: frontline staff promising compensation privately. All compensation is set centrally by the brand to avoid inconsistent standards across regions.


14. Execution Checklist ​

  • [ ] Service model selection and regional coverage map

  • [ ] Installer admission standards and insurance requirements

  • [ ] Training and certification completed

  • [ ] Per-unit cost model includes rework and compensation rates

  • [ ] Regional cost baseline filled: labour/visit/mileage/height/consumables, ≥2 quotes, median

  • [ ] SLA compensation ladder formulaic: late / reschedule / no-show / cancellation written into the contract

  • [ ] Quality metrics tied to settlement: first-visit success, rework rate, photo compliance

  • [ ] All 12 contract clauses confirmed

  • [ ] Category differences applied: storage/solar get licensing gates and higher compensation

  • [ ] Safety and insurance in place: height/electrical/battery controls + three insurance layers

  • [ ] Incident response drilled: 2h report / 24h evidence / 48h classification

  • [ ] Scheduling/rescheduling/no-show rules

  • [ ] Pre-installation inspection and photo evidence

  • [ ] Liability layering and insurance claims process

  • [ ] Van stock list and acceptance form

  • [ ] 7-day follow-up and NPS collection



Review record (2026-10-22): This is an installation-service operating framework. Cost and SLA figures are empirical ranges and must be calibrated against regional provider quotes.